1 |
Boiler, 3x125 t/hr. min. at 41 bar G & 400 C,
complete with electric motor driven F.D. Fan
|
|
|
2 |
Turbo-alternators, 3x15 M.W. at 11 KV.
0.85o with controlled extraction
non-controlled bleed steam 25 t/hr.
min.at 2Bar G.
|
with condenser 150 t/hr.
steam 50 t/hr.min.at 12 Bar.G.plus *Q=Power Factor. |
|
3 |
Feed water pumps, 3x170 t/hr at 68
Bar G 2 electric motor driven, 1 steam
turbine driven inlet 41 Bar G outlet
2 Bars G.
|
|
|
4 |
Refinery cooling water pumps 3x8000M/hr.
at 6 Bars G; 2 electric motor driven& 1 steam
turbine driven, inlet 41 Bar G, outlet 2 Bar G
|
|
|
5 |
Power plant C.W. pumps, 3x3300M/hr., at 2 Bar
G. 2 electric motor driven and 1 steam turbine
driven inlet 41 Bar G, outlet 2 Bar G
|
|
|
6 |
Booster pumps 3x130 tht. at 7 Bar G.2 electric
motor driven and 1 steam turbine driven, inlet 41 Bar
G, outlet 2 Bar G.
|
|
|
7 |
Fuel Oil Pumps, 3x150 t/hr. at 17 Bar G, 2 electric
motor driven and 1 steam turbine driven, inlet 41 Bar
G. outlet .
|
|
|
8 |
Fire pumps, 2x440 B.H.P. 1 electric motor
driven inlet 41 Bar G. outlet atmosphere
|
Discharged=250 P.S.I.G |
|
9 |
Air Compressor 3x2000m/hr, 2 eleltric
and 1 steam turbine driven, inlet 41 Bar G.
outlet 2 Bar G
|
Discharge=110 P.S.I.G. |
|
10 |
De-salination plants 3x35 t/hr. working at 2
at 2 Bar G steam 8 steam 8 t/hr.
|
|
|
11 |
Degenerating heater 2x300 t/hr. at 2 Bar G, with surge tank of 20 minutes of
boiler load capacity
|
|
|
12 |
Fuel Oil heaters 2 Nos. (F.O.) No.6. |
|
|
13 |
Vacuum bottoms burning capacity with pumps, heaters and storage tank
|
|
|
14 |
Aqua tower system complete with I.D. fans and 2 circulation pumps
|
|
|
15 |
Fuel Oil tank 1 No. (F.O) No.6 |
|
|
16 |
Demergency diesel set for total black out (Capable of operating power station
auxiliary system).starting of T/A extraction pumps complete with 2 F.D. fans
emergency lights and aqua and towersystem
|
|
|
17 |
Hot stand-by on individual spare pumps. |
|
|
18 |
Chlorine production and injection plant. |
|
|
19 |
Install one no. (New) diesel driven fire pump,
capacity 1200 M./ht.
|
|
|
20 |
Switch gears feeders panel (complete system)
11 KV.
|
|
|
20/A |
See below. |
|
|
21 |
The following work is required to be executed in the existing power station:-
a. Renewal of the 42" C.W. Cement lined pipe including
the valve.
b. Replacement of One oily sump pump.
c. Replacement of C.W. band screen, 3 Nos.
d. Renewal of No.1 Booster pump steam turbine.
e. Renewal of the 36" power plant C.W. heater.
f. Replacement of the 10" & 12" steam & feed
water range valves.
|
12"for 600 A steam.
10"for 400 A F.W.
|
|
22 |
A lump sum to purchase, install, test and commission.
items defined in Item 21 above which will remain in
operation/stand – by and also the existing building and
structures.
|
|
|
22/A |
Tie-ins for power and other services between the existing
and new power stations are required, to be studied &
reviewed.
|
|
|
23 |
Dosing system continuos |
|